by BandA
Where are they going to put the trains if they put a temporary Olympic stadium at Widdet Circle? And another venue at Beacon Park?
I don't think South Station expansion will be ready in time, which will be a HUGE problem. Maybe the US Treasury can cut a check to the Post Office to buy out the sorting facility. The post office is closing almost-new sorting facilities in Waltham and Shrewsbury, so they can downsize Boston and shift some stuff elsewhere.
I like the idea of temporary (portable for reuse at special events?) fare gates for the CR stations, with trains every 15 min. Full high level platforms on all stations of the Framingham line to reduce dwell. Major ADA compliance headache at Newtonville / West Newton.
Extend D - Riverside via Highland Branch out to the main line at either Auburndale or Wellesley Farms to facilitate CR transfers.
Break down and buy electric engines for Providence line trains, to maximize acceleration / reduce interference of CR on the crowded NEC. Also electrify Fairmont line and use off-the-shelf (or whatever MNCR is buying) EMU's.
Implement Back Bay - Waterfront shuttle (magically going through or over the yards) using push-pull instead of DMU. Buy a second class of smaller diesel engines designed to pull up to 3-4 coaches at speed. Use these small trains for the shuttle and smaller lines / midday & wknd service.
Adding a green line branch to Needham (or extending Needham CR to meet the green line) probably won't happen in time unless the rail-trail project is halted. You can't simultaneously pull up tracks and install tracks, lol.
Need storage tracks everywhere, and express tracks for green/red/orange lines. Press existing orange/red fleet back into service to supplement Olympic service.
I don't think South Station expansion will be ready in time, which will be a HUGE problem. Maybe the US Treasury can cut a check to the Post Office to buy out the sorting facility. The post office is closing almost-new sorting facilities in Waltham and Shrewsbury, so they can downsize Boston and shift some stuff elsewhere.
I like the idea of temporary (portable for reuse at special events?) fare gates for the CR stations, with trains every 15 min. Full high level platforms on all stations of the Framingham line to reduce dwell. Major ADA compliance headache at Newtonville / West Newton.
Extend D - Riverside via Highland Branch out to the main line at either Auburndale or Wellesley Farms to facilitate CR transfers.
Break down and buy electric engines for Providence line trains, to maximize acceleration / reduce interference of CR on the crowded NEC. Also electrify Fairmont line and use off-the-shelf (or whatever MNCR is buying) EMU's.
Implement Back Bay - Waterfront shuttle (magically going through or over the yards) using push-pull instead of DMU. Buy a second class of smaller diesel engines designed to pull up to 3-4 coaches at speed. Use these small trains for the shuttle and smaller lines / midday & wknd service.
Adding a green line branch to Needham (or extending Needham CR to meet the green line) probably won't happen in time unless the rail-trail project is halted. You can't simultaneously pull up tracks and install tracks, lol.
Need storage tracks everywhere, and express tracks for green/red/orange lines. Press existing orange/red fleet back into service to supplement Olympic service.