Sometime in the 1990's, the overhead was removed between Airport portal and Maverick. It was reinstalled with new brackets and wire for construction purposes as they were afraid the contractors would need access to the ROW in the new Airport construction. After a couple of problems with the new overhead and the realization that the contractors were't going to need the access to the tracks, they kept the 3rd rail alive to airport, but continued to switch over at Maverick.
As I mentioned before, they changed to Airport at the end of the summer. If you look, you will see a good section of overhead missing right at the old Airport Station. It will be replaced, even though that's 3rd rail territory.