On the LAL this morning #421 and #425 came to Avon with 5 gons with ties. They met a cherry picker truck and the LAL MOW articulating loader at the yard and then added 3 covered hoppers to go to the grain storage facilty, while some ties were being unloaded behind Gray Metal Industries just north of the Avon Yard.

Greg
  by Luther Brefo
 
railwatcher wrote:On the LAL this morning #421 and #425 came to Avon with 5 gons with ties. They met a cherry picker truck and the LAL MOW articulating loader at the yard and then added 3 covered hoppers to go to the grain storage facilty, while some ties were being unloaded behind Gray Metal Industries just north of the Avon Yard.

Greg
Interesting...do you think this is to construct new track or to replace dying ties?

  by railwatcher
 
I drove by Gray Metal at 3pm and they are still behind there unloading. I assume they may be getting ready to add a siding. Maybe someone can enlighten us.

Greg

  by railwatcher
 
The gons were parked overnight on the Avon Industrial spur by King Cole Bean Co. I will be checking them out later. Must be more to be dropped off the gons yet, today.

Greg

  by railwatcher
 
3/2/06 LAL #20 and five more low side gons have entered Avon. What are we building?

Greg

  by nessman
 
Could just be deliveries of ties for routine maintenance.

  by Otto Vondrak
 
I assume this is part of a rebuilding and maintenance project, and not new construction. LAL has been on an ambitious tie replacement program for the last 10 years or more, and the work has been paying off.

-otto-

  by railwatcher
 
Two more cars with ties are sitting in the yard siding near the Avon station. Two others are still sitting at the far northern end of the Avon yard team tracks on the eastern track. So what ever the project it is, a siding or a maintaining project, its gonna be a good one. Also there might be some for the impending addition of the Barilla siding that will have to be added in the future. :-D

Greg
  by the1jp
 
I was doing my usual Saturday morning walk and passed by 2 more gons full of ties on the team track in the village of Avon. One gon has been sitting there since Monday or Tuesday, The other appeared Friday3-24.
I agree that these ties are just for normal tie replacement.
I wonder,how many years did the LA&L go without a regular tie replacement program?

  by railwatcher
 
Noticed that there are 5 or 6 more gondolas with ties sitting in the Avon yard. I was gone for the past 6 days road and they were there when I got back late last night. I believe this makes it about 21 carloads of ties so far, unless I have lost track (an interesting thought to have...."lost track"). I am eager to see the work commence.

Greg

  by railwatcher
 
4-13-06 LAL #20 moved three more carloads of ties to behind Gray Metal Industries this morning for stacking. Pictures are at railwatcherphotos. The stacks are getting huge!

Greg