by MN-P32AC-DM-201-227
At first reading about a Gp-35, 107 I thought it was a misprint, but after doing a bit of research I come to find out that the new 107 a GP-35 is a ex Soo Line loco. Was this a Brookville loco? Petty nice to see a new GP-35 added to the fleet.
Probably already posted, At the 3/25/2015 MTA meeting they discuss the following...."GP-35 Locomotive Overhaul ($11.0 M)•An in-kind overhaul with complete electrical rewire of six Mero-NorthGP35locomotives and the procurement and overhaul of an additional GP35 (total of 7). The locomotives are in excess of their expected life and are no longer able to perform reliably. The additional GP35 is to replace an existing Metro-North GP8 locomotive.Project is estimated to be complete by mid-2016.BL-20 Overhaul ($15.6 MM)*•BL-20 Locomotives delivered in 2008 will begin overhaul in 2015.Genesis Overhaul (Budget TBD)*•The Genesis fleet is on a cyclical overhaul program that will begin in 2015. "
Looks like 107 is here, seen here with its twin 105.
http://www.railpictures.net/viewphoto.p ... 899&nseq=6" onclick="window.open(this.href);return false;
HAPPY NEW YEAR!!
Probably already posted, At the 3/25/2015 MTA meeting they discuss the following...."GP-35 Locomotive Overhaul ($11.0 M)•An in-kind overhaul with complete electrical rewire of six Mero-NorthGP35locomotives and the procurement and overhaul of an additional GP35 (total of 7). The locomotives are in excess of their expected life and are no longer able to perform reliably. The additional GP35 is to replace an existing Metro-North GP8 locomotive.Project is estimated to be complete by mid-2016.BL-20 Overhaul ($15.6 MM)*•BL-20 Locomotives delivered in 2008 will begin overhaul in 2015.Genesis Overhaul (Budget TBD)*•The Genesis fleet is on a cyclical overhaul program that will begin in 2015. "
Looks like 107 is here, seen here with its twin 105.
http://www.railpictures.net/viewphoto.p ... 899&nseq=6" onclick="window.open(this.href);return false;
HAPPY NEW YEAR!!