• Delaware and Raritan River Railroad-General Discussion

  • Pertaining to all railroading subjects, past and present, in New Jersey
Pertaining to all railroading subjects, past and present, in New Jersey

Moderator: David

  by AWSmith
 
Bracdude181 wrote: Tue Mar 05, 2024 10:00 am Oops. Forgot to mention.

Looks like the two for Woodhaven are Plywood loads. First time I recall seeing plywood shipped to them by centerbeam. Usually they get those big portions by boxcar...

Sent from my SM-A146U using Tapatalk
I've seen sheet goods before, This one OSB sheathing. Two center beams. https://youtu.be/U8ZTTwVHiME?si=SFaOr7mppnOLoXtX&t=772
  by JohnFromJersey
 
No 1888? This is probably the first run out of Jamesburg since the reconnection (that I know of) where 1888 and 752 weren't paired to some degree on the train
  by Bracdude181
 
Train appears to have parked on the South Wye Leg in Farmingdale...

Sent from my SM-A146U using Tapatalk

  by Bracdude181
 
South at DCS LAKEWOOD 9:55 AM

1888
752
4 Woodhavens.

Still don't see why they have 2 engines for such a small train.

Sent from my SM-A146U using Tapatalk

  by Blackseal Jim
 
Bracdude181 wrote: Fri Mar 15, 2024 9:00 am South at DCS LAKEWOOD 9:55 AM

1888
752
4 Woodhavens.

Still don't see why they have 2 engines for such a small train.

Sent from my SM-A146U using Tapatalk
They run two engines for a couple of reasons. One , it speeds up switching out Woodhaven since they don't have to run down to the run around track, and second , they like to run short hood forward for better visibility.
Jim Hurley
  by CharlieL
 
Also means they don't tread on Cross Street, a big bone of contention among locals. I'm reasonably sure D&RR management would have taken that into consideration.
  • 1
  • 315
  • 316
  • 317
  • 318
  • 319
  • 324