• GP40-MC Overhaul

  • Discussion relating to commuter rail, light rail, and subway operations of the MBTA.
Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: sery2831, CRail

  by JacobKoppel
 
TrainFan1035 wrote: Wed Sep 28, 2022 11:44 am is 1138 going to be massDOT blue?
Yes
  by Mbtagp40mc
 
JacobKoppel wrote: Tue Sep 20, 2022 8:25 am 1133 got the UTEX rebuild
A rebuild by Progress Rail.
  by Commuterrail1050
 
Why is 1125 sitting dead at BET?
  by TrainFan1035
 
Has Been Having Some Issues
  by GP40MC1118
 
UTEX is an in-house program at BET. Nothing to do with Progress Rail.
  by mbrproductions
 
Yesterday I saw 1122 at North Station for the first time in what seemed like forever, how long has 1122 been back in service?
  by Commuterrail1050
 
Can’t remember the tentative date it came back but not long ago.
  by Commuterrail1050
 
Remember how 1117-29 were listed as awaiting repairs? Now they are getting rebuilt and painted in blue more than likely at rochester like 1125-36-7 are.
  by mbrproductions
 
You mean just 1117 and 1129, or all the GP40MCs between them?
  by Commuterrail1050
 
Yes I meant them all individually that I typed. I was too lazy to type 1117 and 1129 at the time. Same thing with 1125, 1136, and 1137
  by mbrproductions
 
Any updates on the revenue status of 1138? It came back around a month ago after being displayed at the Railfan Day down in the cape, and afaik, its been sitting at Readville ever since.
  by MBTA F40PH-2C 1050
 
went back to Rochester, hasn't been in Readville for about 3 weeks. 1138 failed its ACSES test (ADU has wrong software installed) and there was paint on the contactors, so it couldn't engage the Reverse position
Last edited by CRail on Sun Oct 08, 2023 7:31 am, edited 1 time in total. Reason: Unnecessary quote removed.
  by OldColonyRailfan
 
Quoted from a conductor, they screwed up the paint really badly. Apparently, nothing is working properly because the paint contractor painted over all of the electronics.
  by BandA
 
That's like when they paint your house windows then you can't open them! Painters don't understand electrons.
  by Commuterrail1050
 
Great…. That means all of the electronics will need to be replaced. Hope the paint contractor is paying for their mistakes.
  • 1
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10