by Silverliner II
west point wrote: ↑Mon May 02, 2022 3:51 pm Is Amtrak or will it be required to remove all the 3rd rail impediments on the route. It may be SLE will have to pay for these improvements. Just a thought. Are these shoes permanently extended or are they retractable? If fixed that may be why no one thought about the problem?The third rail shoes are permanently extended, but they will be removed from the M8 sets assigned to SLE for service.
"CSX Detector. Milepost Six Point Four. No Defects. Repeat: No Defects. Total Axles Seven Four Seven. Detector Out"