The Cutoff is a project that is worked on as time(manpower) and material available basis.
After Sandy,the lack of $$$$ to do basic state of good repair work,and now the PTC(ACSES II ) botched installations/software along
with Amtrak's notice of have ACSES installed or NO NEC access as of 12/31/18,have backburnered the cutoff for a while.