  by strench707
 
it looks like they have added the turnout off the main tracks to connect with the Test Track. CSX has a flagman assigned there for a good stretch of track (presumably the entire length of parallel test track that will be built). This it to protect the project workers from passing CSX trains.

The contractor there is also apparently affiliated with the CSX National Gateway Virginia Avenue Tunnel project.

Davis
  by Sand Box John
 
"strench707"
it looks like they have added the turnout off the main tracks to connect with the Test Track. CSX has a flagman assigned there for a good stretch of track (presumably the entire length of parallel test track that will be built). This it to protect the project workers from passing CSX trains.


When I was out there the end of June the turnout parts were staged in the south short term parking lot.

Image

The following weekend the contractor installed the third rail conduits

http://www.wmata.com/Images/Mrel/MF_Uploads/gb.jpg" onclick="window.open(this.href);return false;

When I was out there in early August ties had been and were being delivered to the same parking lot.