Greg Moore wrote:Nope, at the south end of the platforms (I didn't look at the north).
This is in response to a request (requirement?) from the EPA I believe (I'd have to go through my notes) to cut down on idling. For example, in morning (say 5:00 AM) I've seen up to 3 Empire Service trains in the station idling, waiting for their respective trips.
After checking the timetable, I see that this makes sense. There are 4 southbound departures from ALB before the first northbound train arrives at ALB. All four of these trainsets could be staged at platforms in the station during the night, connected to ground power, awaiting their departures in the early morning hours.
Rockingham Racer wrote:Maybe I missed it, but where is CP 143? South of the station? And could anyone post a schematic?
I believe CP 143 is immediately north of the (currently being extended) high level platforms at Rensselaer station.