Railroad Forums 

  • Yard 21 - Somerville

  • Discussion relating to commuter rail, light rail, and subway operations of the MBTA.
Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: sery2831, CRail

 #1385605  by F-line to Dudley via Park
 
Mystic Wharf's also not got a lot of space between grade crossings for stuffing anything longish, and is a vulnerable place for security with open access just about everywhere and difficult monitoring because of the blind spots created by the I-93 decks. Yard 21 by contrast is in end-to-end constant view of Transit Police on the Orange Line and the maint crews milling around the rail/tie piles along the north leg of the freight wye. It's also blocked by a retaining wall + fence from allowing any too-easy trespasser access from the neighborhood side streets.


Massport's got all kinds of long-range plans in the hopper for the Mystic Wharf Branch, but they're all freight. That'll never be, even in reactivated state, any sort of useful or non-awkward place to store MOW equipment.
 #1399957  by dieciduej
 
Looks like the Yard 21 lead is closed.

On the way home, northbound on the Orange Line, I noticed the old flats with old rail panels and so on were gone on the Yard 21 lead. Now three empty flats are there, a little further south than the old set and then a new barricade have been erected on both tracks.

Did anything happen to case the closing or have things just deteriorated to the point of no return?

JoeD
 #1399971  by BostonUrbEx
 
Wide gauge defects were found by the FRA today, possibly found as a result of an investigation of a prior incident not involving the wide gauge. With all the Boston traffic and lack of MOW space, I'm sure it'll be fixed ASAP.
 #1400007  by dieciduej
 
I'd be worried when shoving/pulling 1789 marked tank cars down there.

What ever they do for fixing they first have to start with some serious weed killing. Someone is going to need an ocean of calamine lotion.

JoeD
 #1400039  by deathtopumpkins
 
BostonUrbEx wrote:Wide gauge defects were found by the FRA today, possibly found as a result of an investigation of a prior incident not involving the wide gauge. With all the Boston traffic and lack of MOW space, I'm sure it'll be fixed ASAP.
Would this incident have been last week? I meant to post but never got around to it - one morning last week, I think Friday, there were at least a dozen people in a mix of Pan Am and MBTA vests standing around a covered hopper at the beginning of the "yard".
 #1478283  by dieciduej
 
I noticed the leads to the old Yard 21 in Somerville have been cleared of all trees and invasive vines. I am sure someone on that crew will need an ocean of calamine lotion! :P

There are several places where the retaining wall would need some repair and or replacement. Any guess if they will be replacing the tracks so they can gain some car storage or switching room?
 #1478315  by GP40MC1118
 
Yes, this is work to make these two tracks more usable again. Will be desperately needed once
PAR loses Yard 8/Willey Track.

Hopefully this will put the bike people on notice its still an active railroad. There is a group that wants to
connect the bike/walkway path from the Mystic River to the Community Path being built concurrent with GLX.
It never ends...

D
 #1478551  by ceo
 
Eh, it's perfectly reasonable to keep one track and convert the other. If the Northern Strand Trail is extended across the Mystic River as planned, the Mystic to Charles Connector will be a crucial link in what could be a *huge* connected network of multi-use paths.
 #1478560  by Trinnau
 
Unless the railroad intends to utilize both tracks in light of the removal of (what's left of) yard 8.
Last edited by CRail on Sat Jul 07, 2018 2:56 pm, edited 1 time in total. Reason: Unnecessary quote removed.
 #1478563  by Arborwayfan
 
PSA: they can now give you a shot of some steroid or other to clear up poison ivy. I got PI last spring and was itching away until someone at work asked me what they had given me for it. Given me for it, I asked? So I went down to our company health clinic and got a short and boom, a lot better in a few hours.

Not exactly a railroad topic, but also not irrelevant to railfans. (The best crop of poison ivy I ever saw was on the abandoned Dedham branch about 1991, before the trail was built, when my girlfriend and I were following the old rails and turned back because of massive PI blocking the whole cut, hanging off the granite retaining wall, etc.)
 #1478601  by newpylong
 
ceo wrote:Eh, it's perfectly reasonable to keep one track and convert the other. If the Northern Strand Trail is extended across the Mystic River as planned, the Mystic to Charles Connector will be a crucial link in what could be a *huge* connected network of multi-use paths.
No, it's more reasonable for the path to go somewhere else and the tracks used for what they were intended for.
 #1478668  by GP40MC1118
 
Not to mention that two tracks are needed not only for capacity/storage requirements, but to runaround cars/trains.

D
 #1481985  by jonnhrr
 
Is there a map of some kind that identifies where these various yards are?

Were there really that many yards on the former B&M in the Boston area, or did they just like to use random numbers?

Jon
 #1481989  by CRail
 
There were really that many.
  • 1
  • 2
  • 3
  • 4
  • 5
  • 7