Walked on my feet to Wheelspur and looked with my eyes from a publicly accessible location:
The switching lead has been cut back to a new bumper block, and the eastern section has been connected to C secondary with a new switch. There are two tracks in Wheelspur, one follows the perimeter, and one runs next to the two buildings.
It seems logical that they would be double ended, along with the switching lead as well, but I can't see any evidence (yet) of connections at the DB bridge end.
The switching lead has been cut back to a new bumper block, and the eastern section has been connected to C secondary with a new switch. There are two tracks in Wheelspur, one follows the perimeter, and one runs next to the two buildings.
It seems logical that they would be double ended, along with the switching lead as well, but I can't see any evidence (yet) of connections at the DB bridge end.