Railroad Forums 

  • Interesting Consist Discussion for the North Side

  • Discussion relating to commuter rail, light rail, and subway operations of the MBTA.
Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: sery2831, CRail

 #1462766  by GP40MC1118
 
The 1062 set is assigned to PTC Testing on the Northside. It works nights Sunday through Thursday.
Has been going to the Southside on weekends to test on the Stoughton Branch. It's now an all MDOT
consist by bringing three stored MBB's from Rochester to BET Monday.

D
 #1464317  by CRail
 
1129-1627 is running backwards tonight and tomorrow morning. It should be the first train in from Fitchburg tomorrow I'm told.
 #1464494  by BostonUrbEx
 
RenegadeMonster wrote:Saw an Outbound Train come through Salem this morning around 7:00am that was also backwards. The next Outbound train which we passed at the south side of the tunnel had a engine on both ends.
If I remember right, standard move would be for Train 100 to turn as Train 153, which would have been the outbound in Salem at about that time, so that makes sense. I don't recall where 101's equipment usually comes from, which should have been the next outbound you saw.
  • 1
  • 35
  • 36
  • 37
  • 38
  • 39
  • 42