I thought we were talking about the siding that runs alongside the woods track. It runs from Rockingham and ends before the 85 bridge? That’s a pretty small stretch.
Railroad Forums
Moderator: MEC407
Trinnau wrote: ↑Mon Apr 27, 2020 9:45 pm That's referred to as the passing track. Probably dates back to a much busier time and different use. The Controlled Siding we are discussing is the name for the 2nd track from 256 to 258.The switches that were replaced are the ones from the CS to the passing track.
Jonathan603 wrote:This is not very post/news worthy but there is a rather large tree across the unused track just before Patterson Drive.Give them a call and report it. http://www.panamrailways.com/emergency-contacts