  by Paul1705
 
Arlington wrote:And is it the case that mostly what's missing from the 1970s tunnel sections is the gaps where the stations were supposed to go? (And what did get built were just the concrete tube/box)? At the dawn of the internet (1994) most graphics for SAS showed "here are the sections that have actually been built."
Yes, there is a gap from about 105th to 110th street where the 106th Street station is supposed to fit. (I think the 1970s tunnel from 99th to 105th is now used for tail tracks on the line that opened in 2017.)

There is a completed tunnel from about 110 to 120th; in the 1970s there was supposed to be a station called Triboro Plaza around 121st to 123rd Streets (next to the Taino Towers apartments). That station has been cancelled and replaced by the one proposed at 125th and Lexington.
  by Jeff Smith
 
Speaking of earlier work: NYDailyNews.com

Apparently, the stretch including the planned 116th St. Station was supposed to be demolished, at great cost. Brief, fair-use:
MTA figures out how to save $500M on Second Ave. Subway by using 1970s tunnel

A blast from the past may save the MTA $500 million on the next phase of the Second Ave. subway.

A tunnel built in the 1970s by urban planners who tried and failed to construct a Second Ave. line will now be re-purposed by the MTA for the exact same project some 40 years later.

The tunnel stretches from 110th St. to 120th St. in East Harlem — and Janno Lieber, head of MTA construction, said he and his colleagues recently discovered they could build a planned 116th St. station in the underground space, which was not intended to house a stop when it was first dug up decades ago.
...
  by Backshophoss
 
Nice to be able to use this section,and NOT tear up the neighborhood to rebuild the tunnels! :-)
  by jlr3266
 
I remember many a day flushing the dirty water caused by work to the utilities. And asking my dad why 2nd Ave was so old fashioned that it had wood plank paving! LOL
  by Jeff Smith
 
For the life of me, I still don't know why this wasn't ready for build as soon as Phase I was open:

https://patch.com/new-york/midtown-nyc/ ... unge-cuomo
...
Cuomo said Tuesday that he will travel to Washington D.C. to discuss his infrastructure ideas with President Donald Trump this week. Other projects identified by Cuomo for an early start are the expansion of the Second Avenue Subway to East Harlem and the LaGuardia Airport AirTrain.
  by Head-end View
 
At the speed these projects are ever done, we're lucky we even got Phase-1 completed. We'll be really lucky if Phases 2 & 3 ever get done in our lifetime.
  by Jeff Smith
 
Going back a couple of months:

MassTransitMag.com: MTA releases schedule of $8.8 billion on committed work to begin construction in 2020 from prior capital plans
2020 Fourth Quarter: $1.323 million

Metro-North Penn Station Access
ADA accessibility at 68 St-Hunter College 6, Bay Ridge-95 St R and Court Square G
New substation at Canal St / 8 Av
Second Avenue Subway Phase II (initial commitment)
45 new electric buses and electrification of six bus depots
Sandy resiliency at West Side Yard and East River Tunnel

2021: $2.293 million

Second Avenue Subway Phase II: Civil Work for new stations at 106th, 116th and 125th Streets
Purchase 25 standard buses
Planning for Metro-North Harlem Line Third Track
LIRR Jamaica Capacity Improvements design support
Sandy Mitigation: Long Island City Yard Perimeter Protection