NJTMNRRBUFF I clarified that I meant "pedestrian" overhead. I'm in no way recommending a full station or any track reconfiguration, just platforms on the interior of the wye. The non-wye side you could get a decent length platform, 6 cars I think, maybe even 8. But the wye side, you're only looking at maybe a 4-cars or less platform on the main line I think, and shuttle only on the wye.
There's really no place to put a regular station with parking on the north/wye side, not really (95 is hard on the south side), and in the one lot I'm looking at, you'd need another ped overpass:
Google Sat image of wye. Ironically, you can still see the temp platform in that image as of today.
I also think it's a huge waste to be running three car mini's with either BL's or P32's on the line. They need two car DMU's, and let the freight run at night, or use the DMU's (Stadler?) FRA approved. Sh!t, I'd run it all the way over to Plainville? Bristol? where it could pick up the hated busway.
Heartily agree with Backshophoss. Did not know they were still running SLE deadhead sets from New Haven, though. And I forgot to mention the E Bridgeport moves. A waste and huge inconvenience. On the need to solve the Maybrook issue: I don't think it's a great detour by any stretch but as seen with Maybrook west of Danbury, it's a necessary equipment bridge. And if it gets the TILCON train off WALK, the main line, and a busier Danbury branch, it should be done. And the PW Stone train to LI as well. I fear the cost would be huge, though.