  • Lechmere Viaduct draw span

  • Discussion relating to commuter rail, light rail, and subway operations of the MBTA.
Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: sery2831, CRail

 #1411660  by R36 Combine Coach
 
The USCG drawbridge operating schedule for the Charles River has the MBTA East Cambridge (Lechmere) Viaduct as inactive, but the owner is under obligation to maintain the movable span in operable condition. I noticed the Lechmere span no longer appears to have an opening or joint for raising. Is the span still a functional draw, as apparently so according to USCG?
 #1411664  by MBTA3247
 
Nope. There's welded rail clear across the bridge, and several large pipes just below the ties on the downstream side. I don't think any of the draw mechanism exists anymore; it looks like an ordinary plate girder bridge in my photos.
 #1411854  by boatsmate
 
seems to me that someone has hidden the truth from the Coast Guard. as for passing under the bridge, if it can fit under the Washington st bridge then it will fit under the trolley bridge. If it won't fit under the Washington st bridge then it can not go up the Charles River from the harbor.
 #1411899  by atlantis
 
At one time, of course, the North Washington Street bridge was a rotating bridge. It was closed for good many years ago, perhaps even when the Charlestown elevated Orange Line still existed, although I was just a kid when the El was discontinued so my memory of the operational status of that bridge is vague. That was also before the new Charles River dam was built with its overhead enclosed catwalk which is the same height as the former drawbridges.