  by MattAmity90
 
WOW, what a sight, and OW my heart! That is just so eerie and looks apocalyptic. What was there 100 years ago is no more :( I can just picture a tumbleweed bouncing. Then again the platforms were crumbling and would eventually have to be replaced. I noticed that even after the construction is over, they will have to perform rail-tie replacement work on the two running tracks, just like the Ronkonkoma Branch after it was double-tracked.
  by Tinyplaces
 
MattAmity90 wrote: Mon Jul 27, 2020 11:59 am WOW, what a sight, and OW my heart! That is just so eerie and looks apocalyptic. What was there 100 years ago is no more :( I can just picture a tumbleweed bouncing. Then again the platforms were crumbling and would eventually have to be replaced. I noticed that even after the construction is over, they will have to perform rail-tie replacement work on the two running tracks, just like the Ronkonkoma Branch after it was double-tracked.
I'm wondering how they will approach this. Are they going to wait for the entire project to be completed for rail-tie replacement?
Couldn't they lay the third track in small sections of the corridor while the project is ongoing to save time so it could be used for rail-tie replacement on weekends, so for example between School St (after its completed) and Wantagh Pkwy have a third track placed and electrified while one track is being worked on this way you still have two tracks. The stretch of track between Floral Park and New Hyde Park also comes to mind.
  by MattAmity90
 
That's a bit of a tall order because they would have to construct temporary switches. My idea pertains to making sure that two tracks are in service while one track is receiving rehabilitation. It's a bit complicated too since they kept one track open after they double-tracked the Ronkonkoma Branch, and the second track was already brand spanking new. This time you would have two whole tracks that go the entire stretch from Hicksville to Floral Park.
  by Head-end View
 
A while back someone called our attention to the project plans which specified the reduced-aspect type signals for this project and not full-size color-light or position-light signals. So I was very surprised today to see as I rode a westbound out of Hicksville, what looked like a brand new still bagged full size signal at the second new switch for the new track just west of the station. From its size it looked like a two-head position-light signal though I only got a quick glimpse of it as we went by.

Is it possible that Divide interlocking will still be conventional P-L signals when the dust finally settles in a few years?
  by Head-end View
 
So today I drove over to that area to confirm yesterday's sighting. I drove around behind some factories next to the tracks and the only bagged signal I could see looked like a smaller pedestal type position-light signal. So I may have mistaken that for a full-size signal during the quick sighting I got yesterday. I know the LIRR sometimes uses those pedestal P-L signals temporarily during construction projects so we'll see in the next two years if it's permanent or not.
  by DaveBarraza
 
Temporary, not permanent.