Hi,
I'm planning a trip to the West Coast in September and want to cram in as much as possible into the time I have.
I would like to take in the ACE, Coaster, Caltrain and Metrolink trains with the aim of travelling on trains with as many different locomotives as possible. To aid in making this as easy as possible, can anyone advise what the current train cycles are for any or all of these self-contained operations? Obviously the ACE and Coaster are relatively easy to work out, but Caltrain and especially Metrolink not so much.
TIA
I'm planning a trip to the West Coast in September and want to cram in as much as possible into the time I have.
I would like to take in the ACE, Coaster, Caltrain and Metrolink trains with the aim of travelling on trains with as many different locomotives as possible. To aid in making this as easy as possible, can anyone advise what the current train cycles are for any or all of these self-contained operations? Obviously the ACE and Coaster are relatively easy to work out, but Caltrain and especially Metrolink not so much.
TIA
Last edited by jt42cwr on Mon May 12, 2014 4:12 pm, edited 1 time in total.