Railroad Forums 

  • Franklin/Milford Branch

  • Discussion of the operations of CSX Transportation, from 1980 to the present. Official site can be found here: CSXT.COM.
Discussion of the operations of CSX Transportation, from 1980 to the present. Official site can be found here: CSXT.COM.

Moderator: MBTA F40PH-2C 1050

 #1467948  by Milepost20
 
How often does CSX service the Franklin to Milford line? Is it an overnight Walpole job?

Thanks
 #1468281  by dbperry
 
Does Garelick Farms just past MBTA Forge Park station still get freight service?
 #1468295  by BostonUrbEx
 
So two customers remain beyond Forge Park. Is there anything between Walpole and Forge Park? It'd probably help to get this section transferred over to the G&U sooner rather than later.
 #1495783  by SkiScorcher88
 
BostonUrbEx wrote:So two customers remain beyond Forge Park. Is there anything between Walpole and Forge Park? It'd probably help to get this section transferred over to the G&U sooner rather than later.
Is that really a possibility or just wishful thinking? :) The transfer of this line to the G&U, that is. Any idea what parts of the line would go to the G&U?
 #1496439  by johnpbarlow
 
BTW, the stub of the old G&U turnout off the MBTA Milford branch near S Cedar St in Milford was removed some time over the past few months. Seems strange to see ties and stone installed on a track that rarely sees any activity (annual FRA inspections?). Guess this means MBTA isn't abandoning the moribund line any time soon. :wink:
Attachments:
MBTA G&U switch Milford.JPG
MBTA G&U switch Milford.JPG (165.88 KiB) Viewed 3922 times
MBTA track Milford 122718 small.jpg
MBTA track Milford 122718 small.jpg (359.03 KiB) Viewed 3922 times
 #1496593  by johnpbarlow
 
CSX Engineer 98 wrote:has the G&U spir track been cut in at the runaround in Milford ?

G&U is rumored to be taking over service... so we've been told.
As far as I can tell, as of December, the closest any G&U track currently gets to the MBTA track at Milford is the short isolated stretch G&U built a few years back from the crossing at Main St Milford behind Pinz bowling to Vernon St at the cemetery. It does look as if some vegetation had been cut back parallel to the MBTA track between S Cedar St and Depot St but, as yet, there are no piles of ties/stone/rail to build track in the area. What service is there for G&U to takeover from CSX in the Milford area?