[quote="Port Jervis"][quote="Jtgshu"]That track comes back into the single track at ARCH, and at the other end of ARCH, a passing siding starts on the South Side of the Single. That track is the passing siding, and continues through Annadale Station (the track closest to hte parking lot, that the stupid little asphalt walkways are over, is the siding) and continues to CLINTON interlocking, which is right under the Route 22 and I78 bridges, by the Annandale exit (16 i think?).\quote]
Annandale is Exit 18 off of 78/22.
Funny how the siding that was needed to increase service is not really needed to increase service. (Whitehouse Siding) Primarily, it gives more flexibility right now for X-trains.
The siding between Arch and Clinton is a rather long one. I'm assuming interlocking rules apply for both tracks between Arch and Clinton.
Wouldn't be surprised if NJT upgrades the switches at Arch and Clinton eventually to 45 MPH like the Whitehouse Siding.
~Nick O.:
Moderator: NJT Rail
Moderator of the "widely popular" NJT Rail Forum! What once was first is now seventh!