 #1550322  by Falmouth Secondary to Otis
 
The Cape Cod Central Dinner Train ran last night departing North Falmouth, MA and was great to see running on the rehabilitated Falmouth Secondary line !
Attachments:
Loading Passengers at North Falmouth, MA
Loading Passengers at North Falmouth, MA
DSCF3007.JPG (1.54 MiB) Viewed 3142 times
Dinner Train passing Pocasset marshlands
Dinner Train passing Pocasset marshlands
DSCF3014.JPG (1.47 MiB) Viewed 3142 times
 #1550346  by Safetee
 
Well it looks like it was an interesting job from a qc point of view if the rehab is actually finished. I see five foot wide shoulders but the cribs are half empty.
 #1550351  by Falmouth Secondary to Otis
 
Getting close to being finished as Tie replacement has been completed / ROW has been cleaned up of old ties / spikes & metal debris. Ballast regulator has been run down the line to prep it for ballast. From what I hear ballast should be put down in another week or two, then Railworks can finish up what's left to complete the project. Then going forward there are 2 crossing's on the Falmouth Secondary that are supposed to be replaced by a different contractor sometime before winter.
Last edited by MEC407 on Sun Aug 16, 2020 11:45 am, edited 1 time in total. Reason: unnecessary quoting
 #1550832  by malbojah
 
Falmouth Secondary to Otis wrote: Sat Aug 15, 2020 5:40 pm Then going forward there are 2 crossing's on the Falmouth Secondary that are supposed to be replaced by a different contractor sometime before winter.
I'm assuming that would be Red Brook Harbor Rd @ Parker Boat Yard and County Rd by the Shining Sea Bikeway parking lot?

Red Brook shouldn't be too bad. Hopefully they do a better paving job than Barlows Landing. County Rd will end up being a ****show in terms of traffic and detours.
 #1550846  by Falmouth Secondary to Otis
 
The crossings on the Falmouth Secondary that are to be replaced this year are Monument Neck Rd in Gray Gables at MP 0.82 and Red Brook Harbor Road in Cataumet at MP 4.87. The Monument Neck Rd crossing is supposed to have a temporary road crossing built through the small park next to it. This is so First responders / residents can access the neighborhood while it's under construction because there is only one road into the area. The Rails have already been delivered and have been sitting on the side of the ROW for quite a while now waiting for the crossing work to be done sometime before the end of this year. The Signals / Controls were already replaced last fall at these 2 locations as well. I have seen other crossings already being replaced on Cape this summer at other locations, so time will tell.
 #1551051  by Falmouth Secondary to Otis
 
This afternoon Ballast stone started to be dropped on the Falmouth Secondary beginning at Canal Junction going empty somewhere in between MP 0.40 / MP 0.82 Will be looking to catch up with it tomorrow along the line.
Attachments:
Canal Junction
Canal Junction
DSCF3043.JPG (1.62 MiB) Viewed 2664 times
Bell Rd MP 0.40 looking south
Bell Rd MP 0.40 looking south
DSCF3045.JPG (1.5 MiB) Viewed 2664 times
 #1551133  by Falmouth Secondary to Otis
 
Was at the Back River road bridge by the Lobster Trap Restaurant in Monument Beach MA today at around 2 pm waiting to get a photo of the MC 2008 Otis outbound this afternoon. As I looked across Back River I see 2 kids hanging out on the Back River RR bridge who were probably fishing and of course trespassing as well. I hear the train approaching sounding his horn at the crossing before the bridge and the kids are still there ! The Engineer see's them sounding his horn continuously to get them to move when one of them moves off down the banking while the other just stands there off to the side of the bridge while MC 2008 goes by with 4 loaded C&D cars. As soon as the end car clears the bridge the 2 kids just go back up to the bridge and continue to do whatever they were doing. I guess some people have a death wish from the looks of it ! It was a busy day on the Falmouth Secondary as Railworks crews were out working on ballast that was dumped from the day before, MC 2008 brought down a new load of ballast stone around noon time to be dumped at the next area and returned around 2 pm with 4 loaded C&D cars from Otis while dealing with kids on the bridge at Back river.
Attachments:
Kid moving off to the side finally
Kid moving off to the side finally
DSCF3054.JPG (1.54 MiB) Viewed 2568 times
2 kids back after last car
2 kids back after last car
DSCF3057.JPG (1.63 MiB) Viewed 2568 times
 #1551834  by Falmouth Secondary to Otis
 
Train60 wrote: Sat Jul 11, 2020 9:33 am Great shot. Would be interesting to see the exact same shot when they are done, for comparison purposes.
Here's the before and after photo of Cataumet Station track work
Attachments:
Cataumet Station before track work
Cataumet Station before track work
DSCF2723.JPG (1.5 MiB) Viewed 2285 times
Cataumet Station after track work done
Cataumet Station after track work done
DSCF3113.JPG (1.56 MiB) Viewed 2285 times
 #1552249  by Falmouth Secondary to Otis
 
Manafort Brothers Construction crew started work on the MP 0.82 Monument Neck Rd RR crossing replacement project in Gray Gables, MA on the Falmouth Secondary this morning. Today they are building a temporary road to one side of the crossing to allow for traffic access during construction which is scheduled to begin Monday 9/14/2020
Attachments:
Manafort Equipment / supplies for project
Manafort Equipment / supplies for project
DSCF3120.JPG (1.5 MiB) Viewed 2076 times
Temporary  RR crossing
Temporary RR crossing
DSCF3121.JPG (1.53 MiB) Viewed 2076 times
 #1552352  by Falmouth Secondary to Otis
 
Railworks is back at work on the Falmouth Secondary line doing ballast regulating at the North Falmouth, MA siding tracks with fresh ballast just dropped on the Otis Industrial track as well, waiting to be regulated / tamped next. Big improvement on the Otis line with new ties / ballast, which has been sitting mostly in sand for decades.
Attachments:
Otis line looking north from Rte. 151 bridge
Otis line looking north from Rte. 151 bridge
DSCF3135.JPG (1.52 MiB) Viewed 2051 times
Otis line looking north towards the Base
Otis line looking north towards the Base
DSCF3137.JPG (1.56 MiB) Viewed 2051 times
 #1552469  by Falmouth Secondary to Otis
 
Manafort crew started cutting / pulling the RR Crossing this morning on the Falmouth Secondary line at MP 0.82 Monument Neck Rd in Gray Gables, MA . Should be a smooth ride when completed
Attachments:
Cutting out the old rails
Cutting out the old rails
DSCF3141.JPG (1.49 MiB) Viewed 1912 times
Time for an upgrade
Time for an upgrade
DSCF3145.JPG (1.46 MiB) Viewed 1912 times
 #1552525  by Train60
 
Falmouth Secondary to Otis wrote: Sat Sep 12, 2020 8:01 pm Railworks is back at work on the Falmouth Secondary line doing ballast regulating at the North Falmouth, MA siding tracks with fresh ballast just dropped on the Otis Industrial track as well, waiting to be regulated / tamped next. Big improvement on the Otis line with new ties / ballast, which has been sitting mostly in sand for decades.
And to think, it was only a few years ago that you could see small trees growing though these tracks when crossing the Route 151 bridge over the Otis line. Thank you MassDOT for getting this line back in shape.