This is the feasibility study for replacing the Atlantic St bridge in Stamford:
http://www.ct.gov/dot/lib/dot/documents" onclick="window.open(this.href);return false; ... 04-01c.pdf
It has some neat construction staging track diagrams.
Interestingly, the plan has a provision for extending track 7 from the east to Stamford station. I presume this would be for something similar to the situation at South Norwalk, with a stub track 7 for New Canaan shuttles? Otherwise, for a full through track 7 with platform, you'd have to basically demolish Stamford station!
(Other Stamford bridge replacement studies are to be found here: http://www.ct.gov/dot/cwp/view.asp?a=2303&q=480614" onclick="window.open(this.href);return false; )
http://www.ct.gov/dot/lib/dot/documents" onclick="window.open(this.href);return false; ... 04-01c.pdf
It has some neat construction staging track diagrams.
Interestingly, the plan has a provision for extending track 7 from the east to Stamford station. I presume this would be for something similar to the situation at South Norwalk, with a stub track 7 for New Canaan shuttles? Otherwise, for a full through track 7 with platform, you'd have to basically demolish Stamford station!
(Other Stamford bridge replacement studies are to be found here: http://www.ct.gov/dot/cwp/view.asp?a=2303&q=480614" onclick="window.open(this.href);return false; )