 #909394  by HBLR
 
How are they increasing the tractive effort by that much? Is the new cab that much heavier? Perhaps the prime mover will be heavier? Any details on the prime movers?
 #909597  by Jtgshu
 
Probably newer and better wheel slip control systems which allows more power to be put to the rail before it slips. Its not all weight that matters
 #911112  by ST214
 
Does anyone know if they are being equipped with cab signals?
 #911476  by mmi16
 
ST214 wrote:Does anyone know if they are being equipped with cab signals?
Guess you didn't read the last post on page 1.
 #911860  by Jtgshu
 
Just a minor point, but cab signals and PTC are NOT the same thing.

So according to that post on the first page, they are NOT being equipped with cab signals, but ARE being equipped with PTC, or at least be PTC capable in the future when the final plans are decided and tested and installed, etc.
 #912326  by ST214
 
I am shocked by how many people think they are the same thing.

The main reason I asked is to know if there is any chance of ever seeing them lead on the B&A.
Jtgshu wrote:Just a minor point, but cab signals and PTC are NOT the same thing.

So according to that post on the first page, they are NOT being equipped with cab signals, but ARE being equipped with PTC, or at least be PTC capable in the future when the final plans are decided and tested and installed, etc.