The deal includes building, maintaining, and operating the line for 12 years. Guess oil pays (something we should consider with some of the new technologies like shale, etc., and Keystone Pipeline).
Cross-posting to Worldwide....
http://www.rail.co/2012/01/17/talgo-to- ... rail-line/
Brief, fair-use quote:
Cross-posting to Worldwide....
http://www.rail.co/2012/01/17/talgo-to- ... rail-line/
Brief, fair-use quote:
A Spanish consortium, led by Talgo and Renfe has signed a contract for a high speed rail line connecting Mecca and Medina in Saudi Arabia.
The contract is valued at €6.9 billion.
The contract involves the construction, operation and 12 year maintenance of the Haramain High Speed Rail line.
Next stop, Willoughby
~el Jefe :: RAILROAD.NET Site Administrator/Co-Owner; Carman at Naugatuck Railroad
YouTube Instagram Facebook
~el Jefe :: RAILROAD.NET Site Administrator/Co-Owner; Carman at Naugatuck Railroad
YouTube Instagram Facebook