by MIKEMOXIEMAINE
Having grown up within a 2 minute walk of the branch,Does anyone have a date for when the branch was ripped up? Or when service to the Port stopped?
I know the wye and the long tail tracks at Kennebunk lasted till about the end of steam.
I was told that tail tracks in Kennebunk were used to lay up some passenger equipment on summer weekend,
Seashore got about 2100 track feet of 85 lb rail out of the yard back in the 80's
Thanks
Mike
I know the wye and the long tail tracks at Kennebunk lasted till about the end of steam.
I was told that tail tracks in Kennebunk were used to lay up some passenger equipment on summer weekend,
Seashore got about 2100 track feet of 85 lb rail out of the yard back in the 80's
Thanks
Mike