Discussion relating to the past and present operations of the NYC Subway, PATH, and Staten Island Railway (SIRT).

Moderator: GirlOnTheTrain

  by F40
 
What is the roster for all work equipment trains on PATH? And also, how many tractors does PATH have? (one is #54830)

Does PATH do most of its work during late nights? I saw 54830 with a flatbed car rolling down Pavonia around 12am one day over the summer, and all trains were rerouted on track 1 that night.

  by JLo
 
To answer you anecdotally, I saw a PATH work train of three passenger cars and flat car with a crane at the Hackensack bridge at lunchtime working on the new fencing being installed near the Wittpen Bridge.

  by F40
 
I've seen the fence. It's very conspicuous now looking at it while driving over the skyway. What was the purpose for the fence?

  by F40
 
Is it me, or is this forum really slow in updated posts?

  by JLo
 
It

  by JLo
 
must

  by JLo
 
be

  by JLo
 
you.

  by JLo
 
:wink:

  by F40
 
Good. :-D How about my question?

  by F40
 
I ..... give .... up.

  by JLo
 
I have no definitive answer for you, other than to prevent tresspassing.

  by Irish Chieftain
 
Perhaps the fence might be a preliminary step towards separating the PATH system from the FRA and allowing it to come under FTA auspices? Just a guess on my part...