by MBTA F40PH-2C 1050
I read an article about Ashland and CSX in which Q437 was triggering the Main st. grade crossing while they were building their train and after the town met with CSX, Q437 no longer pulls that far down the line to build their train. If they aren't pulling that far down to build their sometimes massive train, how are they putting it together? I have never seen the Main St. crossing activate while they were putting their train together. They must have had a huge train train that day
Ashland vs. CSX
Ashland vs. CSX