by sery2831
Last night a 300 series coach was placed on track one at the bunter for MBCR crews to have a place to go between trains at north station. This car was damaged about 2 years ago in Manchester-by-the-Sea. They have super tinted the windows so the public cant see in, and have removed half of the seats on the inside. Not sure how the car is going to be powered. After that car was placed, the same crew brought a flat car on track ten to remove the two trailers we used to have for breaks. The MBTAs RC130 wreck crane was used to lift the trailers onto the car, first time I had ever seen the wreck crane inside north station. Too bad I had left my camera at home!