• Trains and operations in Browns Yard

  • Pertaining to all railroading subjects, past and present, in New Jersey
Pertaining to all railroading subjects, past and present, in New Jersey

Moderator: David

  by Bracdude181
 
SA31 Permission to open up 7:05 PM
  by Bracdude181
 
SA31 is sitting in Red Bank yard. They never went back last night…
  by Bracdude181
 
SA31 Southbound at Middletown 5:00 PM

4451 and 7 cars for the C&D.
  by jdh823
 
Seems like the main street crossing in spotswood is getting an upgrade

New crossings are up there as well as a new crossing leading into the new warehouse. Gates are also in the process of being installed
You do not have the required permissions to view the files attached to this post.
  by Bracdude181
 
I hear they’re doing all the crossings on that line. Shame to see the old stuff go but safety first.
  by AceMacSD
 
Bracdude181 wrote: Tue Aug 01, 2023 9:50 am I hear they’re doing all the crossings on that line. Shame to see the old stuff go but safety first.
Making investments for the future. CR Shared'll be doing a lot of crossing upgrades this FY as part of a capital improvement.
  by jdh823
 
AceMacSD wrote: Wed Aug 02, 2023 5:45 am Making investments for the future. CR Shared'll be doing a lot of crossing upgrades this FY as part of a capital improvement.
I'm sure this is also due to the increase in truck traffic brought by the giant warehouse going up right there too.
  by Bracdude181
 
SA31 has CSX 4408 and NS 5286 nose to nose with 18 cars.

Train stopped on the Ernston Road bridge. I think 4408 stalled? 5286 wasn’t putting any power down either…
  by Bracdude181
 
Permission on Church 3:21 PM
  by Bracdude181
 
Permission to open up at Church and occupy Number 2 track 3:36 PM
  • 1
  • 31
  • 32
  • 33
  • 34
  • 35
  • 44