Railroad Forums 

  • F40PH-3C overhaul program

  • Discussion relating to commuter rail, light rail, and subway operations of the MBTA.
Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: sery2831, CRail

 #1617030  by CRail
 
It's down to 1, 1071 has the MBTX tag and is prepped for shipment.
 #1617673  by johnpbarlow
 
...and here's 1072 leading Fitchburg line train 411 into Ayer on Monday 3/6/23.
Attachments:
MBTA F40PH-2C train 411 Ayer 030623.jpg
MBTA F40PH-2C train 411 Ayer 030623.jpg (836.31 KiB) Viewed 1635 times
 #1619018  by mbrproductions
 
What? Why would CSX reject it? Did it present some kind of hazard?
 #1619631  by CRail
 
1071 is still at BET. 1072 has been brought inside and stripped. The era of zipper schemed F40s has ended.
 #1619710  by CRail
 
I thought I'd made that pretty clear. Both went south with Readville Wednesday night.
  • 1
  • 62
  • 63
  • 64
  • 65
  • 66
  • 69