• Trains and operations in Browns Yard

  • Pertaining to all railroading subjects, past and present, in New Jersey
Pertaining to all railroading subjects, past and present, in New Jersey

Moderator: David

  by Bracdude181
 
SA31 Lined and Locked normal at Church 3:45 PM

Unknown car count.
  by nomis
 
Mod Note: I split off the Cranberry Station talk into a new thread.
  by Bracdude181
 
What’s up with OI-16 bringing an empty boxcar and centerbeam into Browns last night?
  by JohnFromJersey
 
Either something in retail called a "misselect" where you get the wrong ordered item, or some customer that is supplied by the Browns Yard network will be shipping product out instead of shipping it in.

We will probably find out by the end of the week
  by CR7876
 
Bracdude181 wrote: Mon Mar 06, 2023 4:23 pm What’s up with OI-16 bringing an empty boxcar and centerbeam into Browns last night?
Billing hasn't caught up to the car yet. The CSXT Box now shows empty, the flat still shows as a load.
  by AceMacSD
 
Misroutes...that or the crew just decided to do what they want to do.
  by Bracdude181
 
OI-16 signal indication at WOOD. Heading for browns with 17 cars.
  by Bracdude181
 
SA31 leaving browns now with CSX 6210 and about 8-10 cars.
  by Bracdude181
 
What’s up with the work in Browns? Looks like they are adding ballast and the power track is being extended? Big front end loader sitting there too. Has what looks like a spiral with claws on the end instead of a bucket.
  by AceMacSD
 
It's called a capital project improvement. There're several projects happening throughout the system.
  by Bracdude181
 
Yeah but like, what exactly are they doing? I could see they are extending the power track it looks like.
  by AceMacSD
 
FWIS in their capital plan, the scope of the capital improvements on Conrail Shared territory is extensive.
  by Bracdude181
 
SA31 broke down in Red Bank last night and is still there as of 1:40 PM today.

They have CSX 6242 and 6210. (You wonder why they broke down)
  by cx4storm
 
SA-31: Permission to occupy track 3 in Red Bank yard. Clear of the main 3:56 PM
  by Bracdude181
 
SA31 permission on Church Running Track 5:02 PM

They don’t have their paperwork and rush hour on NJT is starting.

Soooooooo they might be awhile…
  • 1
  • 30
  • 31
  • 32
  • 33
  • 34
  • 44