RJ Corman has been back at it on the Worcester line this week, working west installing new continuous 136lb rail. This afternoon they were almost to the upper part of Thomas Basin, part of the Wachusett Reservoir. By tomorrow, asuming they are working and at the recent pace, they should be out on the reservoir causeway by Oakdale. They are now replacing older welded rail (vs stick rail that was in other parts of the line). They have panels staged at the crossing that have been passed (from Clinton west) but have not yet re-done the crossings.