Discussion related to commuter rail and transit operators in California past and present including Los Angeles Metrolink and Metro Subway and Light Rail, San Diego Coaster, Sprinter and MTS Trolley, Altamont Commuter Express (Stockton), Caltrain and MUNI (San Francisco), Sacramento RTD Light Rail, and others...

Moderator: lensovet

 #1582072  by west point
 
A WAG. Maybe SF behind is due to more complicated signaling and lack of specialized chips ?
Another WAG. Is CalTrain having the train sets testing at Pueblo qualifying units to a very high speed ?
 #1582285  by lpetrich
 
I searched with Google and I found PowerPoint Presentation - Caltrain Electrification Update PPT2.pdf -- is there any page in Caltrain's site that links to it?

Though dated September 22, that document's detailed statistics are for August 31. Much like the previous update documents -- details are for some weeks before the document's date.

But this document shows in red text changes since the previous month.
 #1584610  by lpetrich
 
Searching again for "Caltrain electrification update" I found PowerPoint Presentation - Peninsula Corridor Electrification Project (PCEP) Project Update PowerPoint.pdf - October 27, 2021

Counts of grade crossing: San Francisco 2, South San Francisco 1, San Bruno 1, Millbrae 1, Burlingame 5, Burlingame/San Mateo (Peninsula Avenue) 1, San Mateo 9, Redwood City 6, Atherton 2, Menlo Park 4, Palo Alto 4, Mountain View 2, Sunnyvale 2, Santa Clara* 1, San Jose 2 (*UPRR owned Reed Street Crossing in Santa Clara)

A grand total of 43.

The update then described the grade-crossing train detectors: a high-speed one and a low-speed one upstream of the crossing, and one downstream of the crossing.

The construction-progress section was dated September 30, like the previous one in being nearly a month behind.
  • Foundations: Segment 1 now at 58%, the other segments done
  • Poles: Seg1: none, Seg2: end of this month? Seg3: done, Seg4: should be done by now
  • Wire: Seg1: one Seg2: steady at 20%, Seg3: done, Seg4: much of it done; all done by the end of this month?
  • Wire testing, signal system: no change
  • Traction power facilities: Burlingame's transformer is 47% installed, low/high-voltage equipment at 5%, sitework 26%, the other facilities approaching completion.
Train testing (quoting the presentation):
  • Dynamic type testing on schedule in Pueblo on trainset 1
  • HVAC type testing trainset 2 ongoing
  • Routine testing trainsets 3 through 6 being performed in SLC
 #1587003  by KTHW
 
The fact that they repainted it makes me think it might stick around to be a rescue engine or be lashed up on the other end of a train set opposite a diesel going past electric territory.
 #1587009  by Head-end View
 
That looks really cool! I'm so sorry these compact, efficient workhorses are gone from the Northeast Corridor.
 #1587134  by ExCon90
 
KTHW wrote: Wed Dec 15, 2021 9:23 pm The fact that they repainted it makes me think it might stick around to be a rescue engine or be lashed up on the other end of a train set opposite a diesel going past electric territory.
The link provided above by ST Saint states that the repainting was contributed by Herzog. Caltrain is very diligent in keeping the public informed of progress and doesn't want passengers seeing hard-worn, disheveled-looking M/W equipment.

Also, scroll down to a tweet by Christof Spieler with a photo of the Amtrak/NJT station at EWR and the accompanying pungent comment. (Nothing to do with Caltrain, but worth noting.)
 #1587145  by eolesen
 
Those toasters look pretty good with actual paint, or is that a wrap?...

My guess is they'll be used for work train service as well as rescue movements.
 #1588847  by lpetrich
 
Caltrain Electrification Update January 6, 2022 - Caltrain Electrification Update PowerPoint3.pdf

"Revenue service date remains fall 2024"
  • Foundations: 3,092 -- Seg 1: 25 remaining, Segs 2, 3, 4: complete -- completion "Winter 2022"
  • Poles: 2,587 -- Segs 1, 2: 758 remaining, Segs 3, 4: complete
  • Wire (300 mi) -- Segs 1, 2: 100 mi remaining, Segs 3, 4: complete
  • Segment energizing -- Seg 4: "Winter 2022"
  • Segment completion -- Seg 4: "Spring 2022"
  • Traction power - 80% complete, completion "Fall 2022"
  • Signal work -- Segs 1, 3: completion "Winter 2023", Seg 2: cutover "Mid-March", completion "November 2022", Seg 4: complete
Date: 2021 Dec 15. The wire is reported in "linear feet", which seems like a tautology. But I'm guessing that it's total length of wire, since the total reported is 1.5 million feet or 300 miles, 6 times longer than the route length of 50 miles.

The first trainset was successfully tested for 4,000 miles. It will be shipped March 2022. The 14th one will arrive winter 2023, and the 19th one summer 2024.

Also a "Crossing Optimization Project" for the grade crossings.
 #1591115  by RRspatch2
 
Sounds like they got a lot of wire up, at least on the south-end. Has any of the catenary been energized yet and any idea how soon the ex Amtrak AEM7 will start testing the catenary?