 #1545437  by Yellowspoon
 
apodino wrote: Thu Jun 11, 2020 1:01 pm Remember that the Lechmere viaduct is being demolished and rebuilt as far south as the Gilmore Bridge.
I didn't know that, which explains why it will take a year to complete.

Welders are using blow torches to cut the supports and then a crane lowers it to the ground.

As for the shuttle buses, why not just extend the bus routes that terminate at Lechmere and have them terminate at North Station instead. There is a dedicated bus lane. If they don't want to extend all four bus routes, perhaps extend the 87 & 88 as they alternate every 10 minutes to/from Lechmere.
Attachments:
200613_140605_CuttingLechmereElevated.jpg
200613_140605_CuttingLechmereElevated.jpg (129.62 KiB) Viewed 3154 times
200613_140811_LechmereElevatedRemoval.jpg
200613_140811_LechmereElevatedRemoval.jpg (99.08 KiB) Viewed 3154 times
 #1545443  by bostontrainguy
 
The EGE wrote: Tue Jun 09, 2020 6:57 pm That is the plan as far as has been announced, though there hasn't been word on whether the B will loop at GC or Park.
B line was shortened to Park because it was difficult to keep it on schedule. Nothing has changed so don't expect a change to GC.
 #1546009  by soundguise
 
Finally stopped while biking through to take some photos...
8C0893EF-9B6A-4B3D-BD91-D9737087CB29.jpeg
8C0893EF-9B6A-4B3D-BD91-D9737087CB29.jpeg (75.91 KiB) Viewed 2984 times
86C60F8E-55E5-4EC0-ABC7-CEC4F104A7C3.jpeg
86C60F8E-55E5-4EC0-ABC7-CEC4F104A7C3.jpeg (86.49 KiB) Viewed 2984 times
Only a little old steel left.
8C75BF4B-AD02-4D59-9E31-627502CF6169.jpeg
8C75BF4B-AD02-4D59-9E31-627502CF6169.jpeg (66.99 KiB) Viewed 2984 times
Not pictured, some form work with rebar is up near the concrete viaduct looking ready to pour soon.
 #1546036  by MBTA3247
 
The stations are across the street from each other. Depending on where you're going, the extra walk is only a few hundred feet at most.
 #1546110  by Disney Guy
 
Even though the walking distance for most Lechmere users is only a few hundred feet longer, it is much more off-putting and intimidating because of a big high traffic street ( McGrath Hwy) to have to cross.
 #1546162  by rethcir
 
There was a movement to install a pedestrian overpass, i don't know if that went anywhere or was lost in the de-costing round. Seems like a no-brainer. Though it's safe to assume that you will generally be with a pretty good pack of people crossing the street from there.
 #1549125  by Yellowspoon
 
Why haven't they removed these pillars? 80% of the structure from the Gilmore Bridge to Lechmere was removed by June 20th. Why haven't these four pillars been removed? When I was there about three weeks ago, a woman from some preservation society was observing the area. In their current location, the pillars interfere with track placement. What do they plan to do with them? Construction is going on around these pillars. They haven't changed in the 13 days between these two photographs.
Attachments:
200716_224844_B.jpg
200716_224844_B.jpg (69.04 KiB) Viewed 2480 times
200729_RemainingPillars.jpg
200729_RemainingPillars.jpg (69.48 KiB) Viewed 2480 times
 #1549164  by atlantis
 
On a somewhat related note, when the Science Park station was rebuilt after the Green Line relocation, the overhead walkway between the Museum of Science and the station was eliminated so you now have to cross the McGrath highway/Storrow Drive at street level. In my humble opinion, sacrificing safety for aesthetics.
 #1549166  by typesix
 
News media reported that making the pedestrian overpasses handicap accessible, was supposedly not feasible in the space available, which is why they were torn down.
 #1549243  by BandA
 
That kind of behavior makes me angry; those laws/rules should be changed.
Last edited by CRail on Thu Aug 06, 2020 5:15 pm, edited 1 time in total. Reason: Unnecessary quote removed.
 #1549252  by R36 Combine Coach
 
typesix wrote: Fri Jul 31, 2020 2:03 pm News media reported that making the pedestrian overpasses handicap accessible, was supposedly not feasible.
Same occurred when the pedestrian bridge at West 8th Street in Coney Island connecting the NY Aquarium with the elevated subway station was removed in 2013. Reportedly the bridge was maintained by the Wildlife Conservation Society (WCSNY) which operates the aquarium and not NYCT and wasn't footing the bill for
improvements to keep up to spec. All pedestrians now use the street level crosswalk.
 #1549262  by bostontrainguy
 
BandA wrote: Sat Aug 01, 2020 10:15 pm That kind of behavior makes me angry; those laws/rules should be changed.
I agree. We need common sense in these matters. You are going to penalize and endanger everyone especially all the children going to the Museum of Science? Remember the CDOT mess:

https://portal.ct.gov/DOT/News-from-the ... ail-Trains
Last edited by CRail on Thu Aug 06, 2020 5:16 pm, edited 1 time in total. Reason: Nesting quote removed.
 #1549315  by BandA
 
It's my understanding, mostly from reading here, that federal ADA requires all reasonable accommodations, but the state requires equal access. So if there are two entrances they must both be ADA accessible even if the second would require an extra $100M.
 #1549913  by artman
 
Yellowspoon wrote: Thu Jul 30, 2020 5:20 pm Why haven't they removed these pillars? 80% of the structure from the Gilmore Bridge to Lechmere was removed by June 20th. Why haven't these four pillars been removed? When I was there about three weeks ago, a woman from some preservation society was observing the area. In their current location, the pillars interfere with track placement. What do they plan to do with them? Construction is going on around these pillars. They haven't changed in the 13 days between these two photographs.
Just a guess, but taking the pillars down vs the superstructure requires a different set of skills. Rather than just unbolting/cutting and hauling, excavation would need to be done for removal of the buried footings. It may be a different contract entirely.