 #1548222  by Falmouth Secondary to Otis
 
Railworks worked a short day today as it started the 2nd pass from Canal Junction to the beach crossing at MP 2.11 in Monument Beach. Should be ready for plenty of new ballast to be dropped in the next few days.
Attachments:
Done for the day at MP 2.11 Beach crossing
Done for the day at MP 2.11 Beach crossing
DSCF2847.JPG (1.65 MiB) Viewed 2398 times
Approaching MP 1.79 Monument Beach Station
Approaching MP 1.79 Monument Beach Station
DSCF2841.JPG (1.5 MiB) Viewed 2398 times
 #1548276  by Falmouth Secondary to Otis
 
Looks like some mechanical issue's have come up today as Railworks has been stopped at Pocasset, MA MP 3.60 crossing on the Falmouth Secondary since early afternoon with repair trucks working on some of the lead units. Photo was taken early evening and will resume work early in the morning if ready to restart
Attachments:
All stopped at MP 3.60 Pocasset crossing
All stopped at MP 3.60 Pocasset crossing
DSCF2852.JPG (1.62 MiB) Viewed 2283 times
 #1548367  by Falmouth Secondary to Otis
 
Saw all Railworks equipment back at Monument Beach crossing MP 1.79 around 10:30 am before heading off Cape today and early evening found all equipment back at North Falmouth siding for some unknown reason. I then had seen a Nerail photo listed as taken on 7/21/20 showing CCCR & RDC at Lobster Trap Back river bridge only to find out that they were photo shopped fake images. Only real accurate photo's should be allowed to be posted.
 #1548475  by F40 screamer
 
everything went back to N falmouth early afternoon so MC 2008 could make the otis run. she was NB around 1500 through wareham with 5 in tow
Last edited by MEC407 on Thu Jul 23, 2020 8:47 am, edited 1 time in total. Reason: unnecessary quoting
 #1548477  by Falmouth Secondary to Otis
 
Railworks started back up today on the Falmouth Secondary at Pocasset Station site MP 3.60 and worked until dark up to Red Brook Harbor road crossing MP 4.87 with alot of new ties replaced in this section. Just about 2 miles to go to finish up the tie installation at North Falmouth then some new ballast stone when they are ready.
Attachments:
Starting back up at Pocasset MP 3.60
Starting back up at Pocasset MP 3.60
DSCF2856.JPG (1.53 MiB) Viewed 2081 times
Finishing up for the day at Cataumet MP 4.87
Finishing up for the day at Cataumet MP 4.87
DSCF2860.JPG (1.46 MiB) Viewed 2081 times
 #1548669  by Falmouth Secondary to Otis
 
Railworks paused work a couple of different days this week so Mass Coastal could do some runs out to the Otis transfer station, but were busy back at it today getting closer to North Falmouth. I had talked with some Railworks & MC crews and tie work is also continuing out to Joint Base Cape Cod on the Otis Industrial track even though the contract makes no mention of that. Must be using some other source of funding but good to see though as this will stabilize rail access to the base and the transfer station for quite some time into the future.
Attachments:
Cataumet Station
Cataumet Station
DSCF2868.JPG (1.54 MiB) Viewed 1949 times
Otis Industrial track  Rte 28A N Falmouth
Otis Industrial track Rte 28A N Falmouth
DSCF2873.JPG (1.54 MiB) Viewed 1949 times
Otis Industrial track  from Rte 151
Otis Industrial track from Rte 151
DSCF2875.JPG (1.55 MiB) Viewed 1949 times
 #1548749  by Falmouth Secondary to Otis
 
Railworks reached North Falmouth / Otis Junction today replacing ties. Should be dropping new ballast stone this coming week from talking with a Railworks crew member then finishing up the Falmouth Secondary project.
Attachments:
Getting close to finishing up in N Falmouth
Getting close to finishing up in N Falmouth
DSCF2884.JPG (1.56 MiB) Viewed 1857 times
New ties going in at Otis Junction
New ties going in at Otis Junction
DSCF2878.JPG (1.63 MiB) Viewed 1857 times
 #1548791  by Falmouth Secondary to Otis
 
It may be Sunday but the Railworks crew has moved onto the Otis Industrial Track today continuing to replace ties towards the transfer station on Otis / Joint Base Cape Cod. The Transfer station and the Military will certainly have a stable rail line now to use well into the future.
Attachments:
Working up the hill to Otis
Working up the hill to Otis
DSCF2897.JPG (1.5 MiB) Viewed 1768 times
Railworks on the Otis Industrial Track
Railworks on the Otis Industrial Track
DSCF2890.JPG (1.58 MiB) Viewed 1768 times
 #1548794  by Train60
 
Thanks for the pictures! Very much appreciated.

So, is there any stone ballast on the Otis spur? From the looks of it the ties at the moment are sitting in nothing but sand.
 #1548796  by Falmouth Secondary to Otis
 
Otis has some ballast stone at the very beginning but it's mostly sand over it's 6.18 mile length which was built in 1941 by the Federal Government. The Falmouth Secondary ballast is going to be done but not sure about the Otis line as it's work was not even listed in the contract description at all. How it got funded and what work was supposed to be done is unknown other than from what I am seeing and hearing from talking with work crews on the line. The only reference to it was made back in the 2018 State Rail Plan seeking a study of the rehabilitation of the Otis Industrial Track, but have not found any follow up information on that proposed study since the Rail Plan was published.
 #1548812  by pfortnam
 
Does anyone know if the track will extend onto the base itself and all the to the on/off loading ramp near the base HQs? The track on the base were significantly overgrown. See photos.
Attachments:
Tracks at Otis 01.jpg
Tracks at Otis 01.jpg (283.28 KiB) Viewed 1676 times
Tracks at Otis 03.jpg
Tracks at Otis 03.jpg (299.37 KiB) Viewed 1676 times
Tracks at Otis 02.jpg
Tracks at Otis 02.jpg (450.06 KiB) Viewed 1676 times
 #1548856  by Trinnau
 
pfortnam wrote: Sun Jul 26, 2020 10:39 pm The track on the base were significantly overgrown. See photos.
That's not really more than a season's growth of weeds. You could still run a train in there no problem. That just needs a good weed spraying. Significantly overgrown includes trees coming up through the gauge. :wink:
 #1548898  by malbojah
 
You obviously haven't seen what the track ON the base looks like. The trees are about 8 to 10 ft tall right now :-D
Last edited by MEC407 on Tue Jul 28, 2020 9:05 am, edited 1 time in total. Reason: unnecessary quoting
 #1548900  by Falmouth Secondary to Otis
 
Now that the Otis spur is having new ties installed maybe the Military will wake up and do there section. Had heard that the Military was planning on doing some equipment moves but obviously that can't happen until they clear / rehab there own tracks to do so. Last time I saw a photo of a Military move was in September 2008 as per this Nerail Photo.