by CentralValleyRail
Hawaiitiki wrote: ↑Fri Dec 06, 2019 9:40 amIt was also designed for people on the PVL to use it for One-Line Service to the game boy what a bill of goods NJT and the politicians sold them.EuroStar wrote: ↑Thu Dec 05, 2019 9:01 am The lower level at Secaucus has no ability to take frequent shuttles back and forth while accommodating the current level of service on the other tracks. Have you ever been at the lower level when they run concert or game shuttles? All regularly scheduled service comes on a single track and the delays and confusion are horrendous. There is a good reason why nobody is proposing finishing the long forgotten Meadowlands loop. The better known reason is that it is expensive, but the second and also very important reason is that even with the loop, they still cannot run frequent enough service due to limitations at Secaucus.Well, also NJT's original messaging, maps, and indications of the Meadowlands Line before it opened was that it would be its own "line" originating all trains from Hoboken, which IS designed to turn and service trains. That sort of happened at first. Does anyone know if ANY Meadowlands Line trains originate at Hoboken anymore?, maybe one or two an event?