• Crossrail: 'Unrealistic timeframe' caused delays

  • Discussion about railroad topics everywhere outside of Canada and the United States.
Discussion about railroad topics everywhere outside of Canada and the United States.

Moderators: Komachi, David Benton

  by David Benton
 
"Crossrail was driven over its budget and beyond its schedule after bosses clung to an unrealistic opening date, the public spending watchdog said."
https://www.bbc.com/news/uk-england-london-48147695" onclick="window.open(this.href);return false;
  by george matthews
 
It's an immensely complicated project. Perhaps it's not a surprise that it was difficult to estimate the time it would take.