by Alex M
It is the phase before the existing station is leveled. The new station is up. The interior work needs to be done. The fixtures for the half platform are on site for installation once the platform is done.
Railroad Forums
Moderators: GirlOnTheTrain, mtuandrew, Tadman
Arlington wrote:At BWI is there a temporary station? If so I'm guessing it is somehow built into the parking garage?Yes temporary, but not in the parking garage. It's a couple of trailers side by side in the area just to the east of the far (north) end of the track one platform.
2-C+C-2 wrote:I've been in the temp trailer station. It's not bad; the small lobby shop is at one end, ticket off the other, and a set of bathrooms in the middle that are handicap accessible.Arlington wrote:At BWI is there a temporary station? If so I'm guessing it is somehow built into the parking garage?Yes temporary, but not in the parking garage. It's a couple of trailers side by side in the area just to the east of the far (north) end of the track one platform.
Restrooms are separate trailers between the station trailer and the old station building.
Wooden ramps and steps between everything to keep them accessible.
The EGE wrote:PVD only has space for four tracks.I'm fairly sure "TFG" (Providence Airport) is planned 6, and that the garage was built with this in mind. Exactly as it "should have been" at BWI, the plan is for: