Has the MBTA ever considered rebuilding the former New Haven between Framingham and West Concord for shuttle moves between the north and south sides? While it is true that much would have to be done to make it happen, such as rebuilding three miles of track in Sudbury, a new bridge over the Assebet River and installing the diamond in West Concord, the rest of the old line is still in place physically. Using this line would be much shorter run between the two ends verses going to Worcester and Ayer and would be entirely under the T's control. Hopefully, the T will keep this line in place as an eventual rail line over turning it into a future bike trail.