• Mass Coastal Railroad (MC) Discussion

  • Pertaining to all railroading subjects, past and present, in New England
Pertaining to all railroading subjects, past and present, in New England

Moderators: MEC407, NHN503

  by fogg1703
 
With the Sakonnet River Bridge dismantle well under way and the barges unloading in Fall River, any chance Excel or Mid-City will be increasing outbound scrap loads?
  by SOCO11
 
I was in Fall River today and I saw there is a construction staging area right next to tracks by Saltine Warrior. There was no signage yet. Is this track rebuild prep?
  by fogg1703
 
fogg1703 wrote:The new C&D operation is a subsidiary of G Lopes Construction/NE Recycling called Future Fuels. With the new trackage they have built (1 interior loading track and two exterior storage tracks) I would assume they are in need of a track mobile to shuffle cars when they open. Wonder if MC could get the rights to switch Myles Standish Industrial Park from CSX to see if they could win back some former rail shippers with increased service. As it stands I think only the Americold siding is being used. Could keep an MC switcher busy all day just switching Taunton area industries.
As an update, saw a Track Mobile pushing around about a dozen loaded C&D cars at the new Lopes operation on Prince Henry Dr in Taunton this past week. Cars were spotted down near Fremont St and near the end of the spur by Americold. Can a non CSX (MC or Lopes) employee operate a Track Mobile on CSX track as they had to run the length of the line into Myles Standish Industrial Park to pick up empties near Fremont St. No markings on the Track Mobile, could this be the one MC was using on Dean St for Excel scrap loads last year?
  by SOCO11
 
SOCO11 wrote:I was in Fall River today and I saw there is a construction staging area right next to tracks by Saltine Warrior. There was no signage yet. Is this track rebuild prep?
Disappointing - it is staging for a large sewer main project
  by Falmouth Secondary to Otis
 
Was on the Cape Cod Canal service road today and the Sagamore RR siding just past under the Sagamore bridge is being rebuilt with all new ties / ballast per the MassDOT 5 year capital investment plan. Also a new Cape Cod Central Railroad whistle stop at the Pairpoint Glass works in Sagamore was added recently for an addition to it's scenic tourist trains stops. See MassCoastal ROW page below for photo's / info on that.

https://www.facebook.com/pg/MCRRMOW/pho ... e_internal" onclick="window.open(this.href);return false;
You do not have the required permissions to view the files attached to this post.
  by Falmouth Secondary to Otis
 
Noticed today that Barlow's Landing RR crossing in Pocasset has fresh ties stacked next to crossing & area has been flagged by underground utilities. Looks like Mass Coastal ROW will be working on it soon !
  by New Haven 1
 
Thought that you would like to know that your link doesn't appear to work.
  by Falmouth Secondary to Otis
 
Barlow's Landing RR crossing replacement in Pocasset completed today & big improvement to travel over ! Was walking tracks leading up to crossing on both sides and RR ties are really in tough shape, time for some serious tie replacement for sure.
You do not have the required permissions to view the files attached to this post.
  by Falmouth Secondary to Otis
 
Good article about UCRTS facility now renamed as Upper Cape Resource Recovery Facility on Joint Base Cape Cod. Read a photo comment on MassCoastal ROW site that the Falmouth secondary line tie / ballast replacement work is in the planning stages to be done, which is good news as the line is certainly in need of repair.

https://www.capenews.net/regional_news/ ... 35735.html" onclick="window.open(this.href);return false;
  by Falmouth Secondary to Otis
 
Cape Cod Central Dinner Train will be departing North Falmouth,MA @ 5:30 PM this coming Friday 8/10/18 heading towards the Cape Cod Canal on the Falmouth Secondary. It will probably meet up with the Cape Flyer at Canal Junction and do a Canal crossing after the Flyer heads to Hyannis. Depending on the weather could get some good photo's.
  by Backshophoss
 
There's been word that IP was not renewed as the contract operator of Mass Central,who got the new contract as operator?
  by GP40MC1118
 
Not sure if it was awarded. I heard something to effect that early 2019 is the new target date.

D
  • 1
  • 20
  • 21
  • 22
  • 23
  • 24
  • 47