• Wellingtion Yard Overhall

  • Discussion relating to commuter rail, light rail, and subway operations of the MBTA.
Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: sery2831, CRail

  by dieciduej
 
She's back! I found a six-car test train on the Orange Line test track this Saturday morning, about 8 AM. From what I could see they have activated from Wellington to Sullivan Sq, with a tie across the tracks just past the south end of the Sullivan platform. And at 8 PM this Saturday evening she was still going back-and-forth. Still the third rail only runs to the crest of the flyover, but the dixie cups are in place south to the base of the flyover.

So can the Main Line #14s be not far away from testing?
Orange Line Test Track's Back.jpg
JoeD
You do not have the required permissions to view the files attached to this post.
  by RenegadeMonster
 
I'm waiting for the day that we see the new orange line cars on the test track. Should be soon I would think