  by johnpbarlow
 
New steel or aluminum antenna support pole at Needham Heights station.
You do not have the required permissions to view the files attached to this post.
  by johnpbarlow
 
Newly installed wood poles north of May St in Needham.
You do not have the required permissions to view the files attached to this post.
  by BandA
 
What happens if they want to double-track (for rabid-transit conversion?)
  by deathtopumpkins
 
Then they rip those new poles out and put up new ones.

What, you honestly expect the T to plan ahead for such things?
  by CRail
 
The entire roadbed would be dug up and relaid, all wayside infrastructure would be cleared out, and 600v transmission lines plus ATO signaling hardware would be dropped. A few wooden poles is not going to hinder such a massive undertaking that has not even been entertained in any preliminary proposals or capital investment plans.
  by johnpbarlow
 
Looks like the hand throw switch for the layover yard lead at the Needham Heights station is getting propane heating.

And, in other news, Sunday service has been instituted today on the Needham line with he Christmas Express (sponsored by St. Joseph Elementary School & Monsignor Haddad Middle School of Needham). Four round trips will board Sunday afternoon at Needham Center and run to the North Pole (aka W Rox according to Keolis crew).
You do not have the required permissions to view the files attached to this post.
  by Rbts Stn
 
We were nearby to Needham Center station that evening and there were hundreds of families getting on/off the train, all appeared to be much happier than the usual Needham line customers do.