Saturday morning, getting ready for the big move.
Closeup of work area
New bridge awaits installation
Bay Crane's amazing equipment that will lift the old bridge and move it to the adjacent lot.
It's getting and dark and the old bridge still remains. The old bridge was so well constructed it took over four hours for torches to free it.
Built about 103 years ago, probably built to last 203 years. The LIRR knew what they were doing back then.
Old bridge moving south on Post Road.
Entering the adjacent lot where old bridge will be lowered in place and eventually dismantled. That's a lot of tonnage of concrete and steel.