by ccutler
Some other photos from my bike ride in BRWRR territory:
Railroad Forums
Moderator: David
ccutler wrote:Here is a photo from just outside the new [veteran-owned, according to sign] cement plant. Those huge concrete blocks, about 4' high, are all over the place. They would be ideal for shipping by rail because of their heavy weight.An empty Center beam flatcar was placed for loading just today, the third or fourth since June.
ccutler wrote:I see the Rinchem website does list having a rail spur on their Flemington site, though I doubt they've used it since moving in.Rinchem received one boxcar at their site in 2014, nothing since.
The propane distributer had a tank car on their spur last weekend.
Will the Lambertville quarry start shipping by rail again when the Lambertville track rehab work is done?