by nomis
The West end switch is currently connected to the 7 leftover tracks on the east end of Beacon Park, and the yard tracks that were not razed were still disconnected with no ladder to access the CP3 / Grand Junction / Houghton Chemical area. This was as of Sun / Monday.
Moderator: Railroad.net/forums
Avatar: An overnight trip on Girard Ave. stumbles upon 6 PCC's and an LRV stuck within two blocks.
Avatar: An overnight trip on Girard Ave. stumbles upon 6 PCC's and an LRV stuck within two blocks.