by nomis
$55 million redesign, two-story building planned for Elizabeth NJ Transit station
http://www.nj.com/union/index.ssf/2015/ ... ation.html
http://www.nj.com/union/index.ssf/2015/ ... ation.html
A total of $55 million in state and federal money will fund the construction of a new two-story building and train platforms at the city's midtown NJ Transit Station, a project officials hailed today as an economic driver.
Preliminary designs of the West Grand Street station, expected to be completed in 2018, include a two-story station building with a street-level ticket office, waiting room and vendor space.
New, longer platforms will be constructed with covered, climate-controlled waiting areas. Elevators to the platform will be renovated, with additional elevators and stairways also planned.
An average of 7,526 passengers travel through Elizabeth Station on weekdays [...].
Moderator: Railroad.net/forums
Avatar: An overnight trip on Girard Ave. stumbles upon 6 PCC's and an LRV stuck within two blocks.
Avatar: An overnight trip on Girard Ave. stumbles upon 6 PCC's and an LRV stuck within two blocks.