by NS_2575
This was supposed to be kept from the common railfan.
Steam engine 142 is scheduled to make its first run after a winter of scheduled
maintenance on Thursday, April 21, 2005.
Plans are to have the locomotive depart east from Butler(it is presently facing
east) and run light(sometime after 11 AM) to Rochelle Park where it will
retrieve the M-1, M-2 and M-4 and then return to Butler where the cars will be switched out and placed as needed.
(Little) Boys and their toys.......
Steam engine 142 is scheduled to make its first run after a winter of scheduled
maintenance on Thursday, April 21, 2005.
Plans are to have the locomotive depart east from Butler(it is presently facing
east) and run light(sometime after 11 AM) to Rochelle Park where it will
retrieve the M-1, M-2 and M-4 and then return to Butler where the cars will be switched out and placed as needed.
(Little) Boys and their toys.......