by MBTA1016
I was looking at goggle maps and it seems possible for csx to serve the ups facility. They would extend track from where it ends and build two grade crossings one on a privite driveway and the other on a side street. There is the power line row they would have to cross, they could go under the towers and power lines. This is all off the existing trackage at the industrial park.
Josh.W
Formally mbta fan
WE ARE BOSTON, WE ARE BOSTON STRONG
Flicker: http://www.flickr.com/photos/116905626@N06/" onclick="window.open(this.href);return false;
Blog: http://jpwilkinson2448.blogspot.com/?m=1" onclick="window.open(this.href);return false;
Formally mbta fan
WE ARE BOSTON, WE ARE BOSTON STRONG
Flicker: http://www.flickr.com/photos/116905626@N06/" onclick="window.open(this.href);return false;
Blog: http://jpwilkinson2448.blogspot.com/?m=1" onclick="window.open(this.href);return false;