  • Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.
Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.

Moderator: MEC407

  • 1941 posts
  • 1
  • 126
  • 127
  • 128
  • 129
  • 130
  by jaymac
 
So unless NS takes over PAS, a completion year of 2050?
  by johnpbarlow
 
Bumping this thread...

Q: As of September 2020, how many, if any, of the FRA compiled list of 23 identified double stack clearance projects along the Patriot Corridor have been completed?

Pownal, VT Hoosick River Bridge Truss Modifications
Williamstown, MA Route 7 (Simonds Road) Track Undercut
North Adams, MA Appalachian Trail (Pedestrian Bridge) Bridge Modifications
North Adams, MA Little Tunnel Track Undercut
North Adams, MA Furnace Street (Pedestrian Bridge) Track Undercut
North Adams, MA State Street (Route 8) Track Undercut
North Adams, MA Hoosic River Truss Modify Bridge Deck/Floor Beams
Florida, MA Hoosac Tunnel Track Cut/Crown Raise
Greenfield, MA Conn River RR / PAR ML Track Undercut
Montague, MA Northfield Road Track Undercut
Montague, MA NECR (CV) Railroad Track Undercut
Montague, MA Bridge Street Truss (AKA Hill Street) Track Undercut
Orange, MA South Main Street Bridge Deck Replacement
Orange, MA Brookside Road (AKA Athol Street) Bridge Replacement
Athol, MA Main Street (Route 2A) Track Cut/Bridge Mod
Athol, MA Chestnut Hill Avenue Track Shifts/Bridge Reconstruction
Templeton, MA Main Street (AKA Depot Road) Track Undercut
Gardner, MA Jackson Street (AKA Pleasant Street) Track Undercut
Fitchburg, MA Rollstone Street Track Undercut
Fitchburg, MA Putnam Street Track Cut/Bridge Mod
Fitchburg, MA Water Street Track Cut/Bridge Mod
Leominster, MA Harvard Street Track Undercut
Ayer, MA Main Street (Route 2A) Track Undercut

https://www.mass.gov/info-details/about ... ve-project
  by johnpbarlow
 
Bumping thread: NS temporarily "metering" container traffic bound for Mechanicville and Ayer IM pads. Given the parking lot PAS has become, i understand why Ayer traffic might be metered but I don’t get why Mechanicville containers should be restricted except that PAS operates the facility.
Sep 29, 2021

Due to a backlog of inbound traffic on the PanAm Southern, effective 00:01 local time tomorrow, Thursday, September 30th, NS will restrict ingates at Chicago 47th for all shipments billed locally to Albany & Ayer.
http://www.nscorp.com/content/nscorp/en ... -ayer.html
  by Trinnau
 
johnpbarlow wrote: Mon Sep 21, 2020 4:23 am Q: As of September 2020, how many, if any, of the FRA compiled list of 23 identified double stack clearance projects along the Patriot Corridor have been completed?
...
https://www.mass.gov/info-details/about ... ve-project
The Fall 2020/Winter 2021 fact sheet found at the link posted tells us at the bottom of page 2 that the next step is to complete environmental review and no funding has been identified for design or construction.

Given it's been about 9 months since then, nothing was designed and the wildcard of the CSX purchase has come into play in that time, the answer is very likely none.
  by atholrail
 
Good tonnage out of EDFLD today.

RJAY took 115 out of EDFLD.
ED8 took 92 out of EDFLD.
EDPO took 91 out of EDFLD.

RJAY stalled at Royalston.